Hi Folks,
I currently have 2 physical locations, A and B. I have one vCenter 5.0 server in each location in linked mode. I have had a lot of issues with linked mode and VMware support tried but was unable to fix. My company just bought vCloud suite and I am looking to go to 5.1.. I tried this in a test environment and all went well except the certs (I wont go into it in this thread). So, here are my questions.
1. With 2 locations with <10ms latency do I need a vCenter server in each location or could I run one from the central location A?
2. If I wanted to start vCenter from scratch, new server, new db etc, is there any way to migrate things like folders, resource pools etc from the old to the new before I start moving hosts?
3. I am trying to get my head around vCloud. Would this help to put a single pane of glass on my environment?
Thanks!